Gilbert, Arizona 15,000 ft 18” and 21” Ultra Rib |
|
| |
Summary:
A new sewer transmission system was installed in Gilbert, Arizona. Construction began in the fall of 2005 and was completed at the end of March, 2006.
Project Data:
Name: Val Vista Sewer
Quantity/Size/Product:
15,000 ft of 18" and 21" Ultra-Rib
Usage: sewer transmission
Embedment Material: 3/8" minus crushed stone
Contacts:
Sales Rep: Todd Karren, PW Eagle 801-580-6854
Engineering Firm: Dibble & Associates, Phoenix, AZ
Project engineer: Ezra Page 602-957-1155
Contractor: Pierson Construction, Project Manager Dana Ratkovich, 480-966-4424
Distributor: National Waterworks, Gilbert, AZ (now HD Supply Waterworks).
Salesperson: Lex Cassiere 480-926-7003.
|
|