PW Eagle Home
Case Studies Home
Back
 
PRODUCTS

Carson, Washington
Water Transmission Pipeline
 

Summary:

The town of Carson, Washington  needed to increase its water supply because they were outgrowing their current source. They acquired a well three miles from town and needed to pipe it to the water treatment center. They chose AWWA approved 12" C909 class 150 water main.

The increased flow area and strength of the pipe was a factor in the decision. The pipe is three to six feet deep using crushed rock for bedding and haunching, and native material for backfill. The contractor liked the lighter weight and ease of handling.

Project Data:

Name:  Carson Washington Water Transmission Pipeline

When:  Summer 2006

Quantity/Size/Products:

17,000 feet of 12" C909 CL150 Ultra-Blue PVC pipe

Usage:  Water transmission

          Embedment Material:  Crushed rock for bedding, native material for backfill 

Contacts:

Sales Rep : Rick Kernan, PW Eagle, 541-954-1362

Contractor : Cascade Equipment & Construction, Inc. Carson, WA

Engineer: Wallis Engineering, Vancouver, WA

Client: Skamania County PUD, Tom Vance, Water plant Supervisor

 
 
back to top